Malabar Wastewater Project

Page 1 2 3
  1. Installation of approximately 130km of Wastewater Collection Sewers (diameter ranging from 200mm to 1500mm) within the following thirteen (13) Sub catchment: Calvary Hill (CH), Mausica/Olton Road (MO), Cleaver Road/Andrew Lane (CA), Lower O’Meara Road (LOR), Mt. Pleasant/Maturita (MP), Upper Pinto Road /Gills’s View (UPG), Upper Malabar/ Tumpuna Road (UMT), Upper O’Meara Road (UOR), Malabar (MA) / Peytonville/ Carapo (PC) and La Horquetta/Greenvale (LH)
  2. Construction of 10 Lift Stations.
  3. Installation of Sewer Service Connections to each property, ranging in diameter from 200mm to 250mm.
  4. Decommissioning and demolition of 8 existing and abandoned Lift Stations and WWTPs.

Establishing a well operated and maintained regional wastewater plant will significantly contribute towards the protection of water sources from the potential transmission of water-borne diseases. In addition, there will be positive impacts on the agricultural sector since many of the farmers located along the East-West Corridor use the same (polluted) waster from the rivers and streams for crop irrigation.

It is anticipated that this project will have overall positive social, environmental and economic benefits. Positive impacts of the project include the reduction in public health hazards through suppression of raw water discharge into the rivers and the environment. The resulting cleaner environment will facilitate the revival of recreational activities along watercourses and increased land values with the decommissioning of defective package water treatment plants.

Additionally the final quality of the treated effluent discharge will exceed the quality requirements of the Water Pollution Rules and will provide the opportunity for further development in recycled water.

 

Phase I - Present Contract

The project currently being undertaken by Sinohydro is referred to as the Phase 1 works. The works include:

  • Construction of the new 40ML/d Plant
  • Construction of three Lift Stations: Arima Lift Station on Upper O’Meara Road, O’Connor Lift Station on Lower O’Meara Road, La Horquetta Lift Station in La Horquetta/Greenvale
  • Construction of approximately 6,680m of gravity savers
  • Construction of approximately 2,900m of force main
  • Construction of approximately 155 service connections in the areas of Sierra Vista, Subero Extension’ Samaroo Village, Ackbarali Road and Emerald Gardens
  • Decommissioning/demolition of one (1) wastewater treatment plant and two (2) lift stations

Construction is scheduled to be completed by June 2017.